JCG Rear End Build – Step Two

After the Housing is prepped, the professionals at GMR install the GMR Snouts and caliper mounts for this specific setup.

Using the GMR9-TX tooling system the Full Floater Snouts are professionally welded into the housing with incredible precision.

When working with such precision parts it is always recommended to TIG weld everything, along with being a very precise weld it is also strong. Nothing compares to the look of a professionally done TIG weld!

Once the Snouts are complete, we then move onto the caliper mounts. Tig welding those on as well.

 

Continue Onto Stage Three of the build up! (CLICK HERE)

Comments are closed.